GENERJİ HEPP FINAL&DETAILED DESIGN

ADMINISTRATION: DSI 7. Regional Directorate / Samsun

 

CLIENT: Generji Elektrik Üretim Ltd. Şti.

 

SCOPE:

 

  • Feasibility Study
  • Final & Detailed Design of Civil Works
  • Final & Detailed Design of Hydro-mechanical parts
  • Final Design of Electrical Works

 

CONTRACT DATE: 2013

 

PROGRESS:

  • Feasibility study completed. Approved by DSI Department of Hydroelectric Energy.
  • Final design completed and approved by DSI 8. Regional Directorate.
  • Construction and commissioning completed.
  • The facility has started commercial operation.

 

PROJECT INFO:

  • Located in Salıpazarı/Samsun/ Turkey,
  • Installed capacity is 644 MWm/ 4.468 MWe,
  • Gross head: 144.70 m
  • Design discharge: 3.50 m³/s