KARAYEL I-II HEPP (FS)

ADMINISTRATION: DSI Department of Hydroelectric Energy

CLIENT: HAMEKA HİDROELEKTRİK ENERJİ ÜRETİM A. Ş.

SCOPE: Preparation of Feasibility Report

DATE: 2017-2018

PROGRESS: Submitted to DSI Department of Hydroelectric Energy

PROJECT INFO:

  • Total Installed Capacity: 10.423 MWm/9.907 Mwe
  • 2 cascade diversion type hydropower facilities
  • Design discharge: 70.0 m³/s, 70.0 m³/s
  • Gross head: 19.10 m total
  • Location: Taşova/Amasya/TURKEY