ADMINISTRATION: DSI 22. Regional Directorate / Trabzon
CLIENT: Ulusal Enerji Üretim Ltd. Şti.
SCOPE:
- Feasibility Study
- Final & Detailed Design of Civil Works
- Final Design of Hydro-mechanical Works
- Final Design of Electrical Works
- Construction Supervision
CONTRACT DATE: 22/10/2013
PROGRESS:
- Final design portfolio is approved by DSI Regional Directorate
- Detailed design of civil Works are completed
- Construction is continuing.
PROJECT INFO:
- Located in Bulancak/Giresun/ Turkey,
- Installed capacity is 83 MWm / 6.56 MWe,
- Comprises a 1500 m long energy tunnel and vertical gate controlled spillway, a reservoir with 70 000 m³ active volume,
- Gross head: 35 m