ADMINISTRATION: DSI 22. Regional Directorate / Trabzon
CLIENT: Kur Enerji Elektrik Üretim A.Ş.
SCOPE:
- Final Feasibility Study
- Final & Detailed Design of Civil Works
- Final & Detailed Design of Hydro-mechanical parts
- Final Design of Electrical Works
CONTRACT DATE: 2012
PROGRESS:
- Final design completed and approved by DSI 22. Regional Directorate.
- Detailed design is completed. Construction and commissioning completed.
- The facility has started commercial operation.
- Final Feasibility study completed. Approved by DSI Department of Hydroelectric Energy.
PROJECT INFO:
- Located in Yomra/Trabzon/ Turkey,
- Installed capacity is 28 MWe,
- Gross head: 102.116 m
- Design discharge: 2.585 m³/s