YALMAN-2 HEPP FINAL & DETAILED DESIGN

ADMINISTRATION: DSİ 4. Regional Directorate / Konya

CLIENT: Yeşilnehir Enerji Üretim Ltd. Şti.

SCOPE:

  • Feasibility Study
  • Final & Detailed Design of Civil Works
  • Final & Detailed Design of Hydro-mechanical Works
  • Final Design of Electrical Works
  • Construction Supervision

CONTRACT DATE: 2015

PROGRESS: Review of final design by DSI is continuing.

Project ınfo:

  • Located in Ermenek/Karaman/Turkey,
  • Installed capacity is 2.90 MWm / 2.60 MWe,
  • Comprises a head pond, 1260.0 m long penstock and a powerhouse.
  • Head pond is situated on already available irrigation channel.