Projects

BUJA 1-2-3 HEPP Cascades

CLIENT: Mavi Yeşil Enerji Ltd. Şti. / ACAR İNŞAAT

SCOPE: Preparation of Bankable Feasibility Report

DATE: 2017

PROGRESS: COMPLETED

PROJECT INFO:

  • Total Installed Capacity: 4.625 MW
  • 3 cascade diversion type hydropower facilities
  • Design discharge: 0.95 m³/s, 1.50 m³/s, 1.80 m³/s
  • Gross head: 448.33 m total
  • Location: Imereti/GEORGIA