GELEN HEPP FINAL&DETAILED DESIGN

ADMINISTRATION: DSI 22. Regional Directorate / Trabzon

 

CLIENT: Ulusal Enerji Üretim Ltd. Şti.

 

SCOPE:

 

  • Feasibility Study
  • Final & Detailed Design of Civil Works
  • Final Design of Hydro-mechanical Works
  • Final Design of Electrical Works
  • Construction Supervision

 

CONTRACT DATE: 22/10/2013

 

PROGRESS:

 

  • Final design portfolio is approved by DSI Regional Directorate
  • Detailed design of civil Works are completed
  • Construction is continuing.

 

PROJECT INFO:

  • Located in Bulancak/Giresun/ Turkey,
  • Installed capacity is 83 MWm / 6.56 MWe,
  • Comprises a 1500 m long energy tunnel and vertical gate controlled spillway, a reservoir with 70 000 m³ active volume,
  • Gross head: 35 m