GELİNTAŞ-II DAM & HEPP
HYDROPOWER PLANTS
Due Diligence
Feasibility Studies
Final and Detailed Design
Mechanical Equipment Design
Construction Supervision
Miscellaneous Services
Refurbishment Projects
INFRASTRUCTURE
Waste Water Treatment plants
Potable Water Treatment plants
Water Supply Projects
WIND POWER
Final and Detailed Design
DAMS & IRRIGATION
Planning
Final and Detailed Design
FLOOD CONTROL
CLIENT:
AKIN HOLDİNG A.Ş.
SCOPE:
Preparation of Energy Generation Report
Hydrology studies
DATE:
2017
PROGRESS:
COMPLETED
PROJECT INFO:
Water supply and energy generation studies of the Gelintaş-II Dam&HEPP and Gelintaş-III Weir and HEPP Cascades were studied and reported. Projects located in Şenkaya/Erzurum/ Turkey has 21.5 MW installed capacity.
Test
Form Gönderimi
Tamam
Contact
Hidroyapı Proje Mühendislik Danışmanlık LTD. ŞTİ.
Kabil Caddesi,1337-2. Sokak, No:2/12, Öveçler / ANKARA / TURKEY
0 312 479 16 30
0 312 479 16 31 info@hidroyapi.com
CORPORATE
About us
Services
Careers
Contact
PROJECTS
HYDROPOWER PLANTS
INFRASTRUCTURE
WIND POWER
DAMS & IRRIGATION
FLOOD CONTROL
© 2025 Hidroyapi.com.| All rights reserved.