ADMINISTRATION: DSI 8. Regional Directorate / Erzurum
CLIENT: TİM ENERJİ ÜRETİM A.Ş.
SCOPE:
- Feasibility Study
- Final & Detailed Design of Civil Works
- Final Design of Hydro-mechanical Works
- Final Design of Electrical Works
CONTRACT DATE: 2012
PROGRESS:
- Final design is completed. Expropriation started.
- Feasibility study completed. Approval stage is continuing.
PROJECT INFO:
- Located in Tercan/Erzincan/ Turkey,
- Installed capacity is 202 MWm/ 16.519 MWe,
- Gross head: 81.0 m + 185.0 m
Design discharge: 6.30 m³/s & 7.80 m³/s