ADMINISTRATION: DSI Department of Hydroelectric Energy
CLIENT: HAMEKA HİDROELEKTRİK ENERJİ ÜRETİM A. Ş.
SCOPE: Preparation of Feasibility Report
DATE: 2017-2018
PROGRESS: Submitted to DSI Department of Hydroelectric Energy
PROJECT INFO:
- Total Installed Capacity: 10.423 MWm/9.907 Mwe
- 2 cascade diversion type hydropower facilities
- Design discharge: 70.0 m³/s, 70.0 m³/s
- Gross head: 19.10 m total
- Location: Taşova/Amasya/TURKEY