CLIENT: MWH Global
ADMINISTRATION: EBRD, EIB
SCOPE:
- Lender’s Engineering
- Preparation of Rational Energy Utilisation Plan (REUP)
- Hydrology studies,
- Technical, economical and administrative evaluation.
DATE: 2017
PROGRESS: COMPLETED
PROJECT INFO:
- Project site is located in Arhavi/Artvin/ Turkey.
- Orta HEPP has 84 MWm / 15.36 MWe installed capacity.
- Design discharge: 3.10 m³/s,
- Gross head: 645.0 m