SEYDİOĞLU HEPP FINAL&DETAILED DESIGN

ADMINISTRATION: DSI 22. Regional Directorate / Trabzon

 

CLIENT: Kur Enerji Elektrik Üretim A.Ş.

 

SCOPE:

 

  • Final Feasibility Study
  • Final & Detailed Design of Civil Works
  • Final & Detailed Design of Hydro-mechanical parts
  • Final Design of Electrical Works

 

CONTRACT DATE: 2012

 

PROGRESS:

  • Final design completed and approved by DSI 22. Regional Directorate.
  • Detailed design is completed. Construction and commissioning completed.
  • The facility has started commercial operation.
  • Final Feasibility study completed. Approved by DSI Department of Hydroelectric Energy.

 

PROJECT INFO:

  • Located in Yomra/Trabzon/ Turkey,
  • Installed capacity is 28 MWe,
  • Gross head: 102.116 m
  • Design discharge: 2.585 m³/s
Test

Form Gönderimi

Tamam

Contact
Hidroyapı Proje Mühendislik Danışmanlık LTD. ŞTİ.
Kabil Caddesi,1337-2. Sokak, No:2/12, Öveçler / ANKARA / TURKEY
0 312 479 16 30
0 312 479 16 31 info@hidroyapi.com
© 2025 Hidroyapi.com.| All rights reserved.