ADMINISTRATION: DSI Department of Hydroelectric Energy
CLIENT: PROEN Enerji ve Madencilik San. ve Tic. A.Ş.
SCOPE: Preparation of Final Feasibility Report
DATE: 2015
PROGRESS: Submitted to and Approved by DSI Department of Hydroelectric Energy
PROJECT INFO:
- Total Installed Capacity: 46 MWm / 3.32 MWe
- Design discharge: 3.50 m³/s
- Gross head: 116.30 m total
- Location: Keşap/Giresun/TURKEY