ADMINISTRATION: DSİ 4. Regional Directorate / Konya
CLIENT: Yeşilnehir Enerji Üretim Ltd. Şti.
SCOPE:
- Feasibility Study
- Final & Detailed Design of Civil Works
- Final & Detailed Design of Hydro-mechanical Works
- Final Design of Electrical Works
- Construction Supervision
CONTRACT DATE: 2015
PROGRESS: Review of final design by DSI is continuing.
Project ınfo:
- Located in Ermenek/Karaman/Turkey,
- Installed capacity is 2.90 MWm / 2.60 MWe,
- Comprises a head pond, 1260.0 m long penstock and a powerhouse.
- Head pond is situated on already available irrigation channel.