ADMINISTRATION: DSI 7. Regional Directorate / Samsun
CLIENT: Generji Elektrik Üretim Ltd. Şti.
SCOPE:
- Feasibility Study
- Final & Detailed Design of Civil Works
- Final & Detailed Design of Hydro-mechanical parts
- Final Design of Electrical Works
CONTRACT DATE: 2013
PROGRESS:
- Feasibility study completed. Approved by DSI Department of Hydroelectric Energy.
- Final design completed and approved by DSI 8. Regional Directorate.
- Construction and commissioning completed.
- The facility has started commercial operation.
PROJECT INFO:
- Located in Salıpazarı/Samsun/ Turkey,
- Installed capacity is 644 MWm/ 4.468 MWe,
- Gross head: 144.70 m
- Design discharge: 3.50 m³/s