ADMINISTRATION: State Hydraulic Works General Directorate Water Supply Department
CLIENT: ER-GE Design
SCOPE: Structural Design
DATE: 2011-2012
PROGRESS: Completed
Structural design and preparation of drawings belong to Gelibolu Potable Water Treatment Plant which is tendered by State Hydraulic Works General Directorate Water Supply Department are performed by Hidroyapı and approved by the mentioned directorate.
Design discharge of the project is Q= 50.000 m3/day.
Structures are;
- Vane Room
- Intake Aeration Chamber
- Primary Ozone
- Clarifiers Chamber
- Filters Chamber
- Treated Water Tank
- Stabilization Tank
- Backwash Water Tank
- Treated Water Flowmeter Room
- Sludge Thickener
- Belt Filter Building
- Chlorination Building
- Administration Building
- Heating Centre
- Guard House
- Primary Ozone Generator Building
- Septic Tank
- Secondary Ozone
- Granular Active Carbon Filter