ADMINISTRATION: Ministry of Energy and Natural Resources/ General Directorate of Turkish Electromechanics Industry/ANKARA
CLIENT: Met Duru Enerji Üretim A.Ş.
SCOPE:
- Hydraulic and structural design of powerhouse related to Replacement of turbines,
- Hydraulic review of available facilities for improvement.
CONTRACT DATE: 2016
PROGRESS:
- Final design completed and approved by General Directorate of Turkish Electromechanics Industry.
- Detailed design is completed. Construction and commissioning completed.
- The facility has started commercial operation with the brand new E/M equipment.
PROJECT INFO:
- Located in Amasya/ Turkey,
- Installed capacity is 10 MWm/1.07 MWe,
- Gross head: 129.0 m
- Design discharge: 1.00 m³/s